• Mon - Sun : 8:30am to 5:00pm

2t or h packaging material cutting steam boiler 2t or h electric steam boilers for disinfection

Available Fuel: Biomass

DHL Series Biomass Fired Steam Boiler

Capacity: 20 – 75 t/h
Working Pressure: 1.25 – 5.4 Mpa
Outlet Temperature: 184 – 485 ℃
Industries: Power generation, heating, chemical, food, rubber.

Available Fuel: Bituminous coal, biomass

DHL Series Coal Fired Steam Boiler

Capacity: 20 – 75 t/h
Working Pressure: 1.25 – 5.4 Mpa
Outlet Temperature: 184 – 485 ℃
Industries: Power generation, heating, chemical, food, rubber.

Available Fuel: Bituminous coal...

DHX Coal Fired CFB Steam Boiler

Capacity: 35 – 75 t/h
Working Pressure: 1.25 – 5.3 Mpa
Outlet Temperature: 194 – 485 ℃
Industries: Chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital.

Available Fuel: Biomass particles

DZL Series Biomass Fired Steam Boiler

Capacity: 2 – 20 t/h
Working Pressure: 1 – 2.5 Mpa
Outlet Temperature: 170 – 225 ℃
Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital.

Available Fuel: Nature gas, coke oven gas...

SZS Series Gas / Oil Fired Steam Boiler

Capacity: 10 - 100 t/h
Working Pressure: 1.0 – 2.5 Mpa
Outlet Temperature: 194 – 540 °C
Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

Available Fuel: Nature gas, coke oven gas...

WNS Series Gas Fired Steam Boiler

Capacity: 1 – 20 t/h
Working Pressure: 0.7 – 2 Mpa
Outlet Temperature: 194 – 540 °C
Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

ロシア(GOST R)、

2008-9-28 · Forms and rules of making documents on technological processes and cutting operations 01.110 25.020 00003-1405 1986 GOST 3.1405-86 1986 Unified system

51140300 Building Services Handbook - DocShare.ti

BUILDING SERVICES HANDBOOK This page intentionally left blank BUILDING SERVICES HANDBOOK Fifth edition Fred Hall and Roger Greeno AMSTERDAM • BOSTON • HEIDELBERG • LONDON NEW YORK • OXFORD • PARIS • SAN DIEGO SAN FRANCISCO • SINGAPORE •

data.go.

Structural integrity evaluation of large main steam piping by water hammering Kim, H. R.; Hyun, O. B. (Korea Electric Power Research Institute, Daejeon (KR)) Heat transfer characteristics of 2t/h

Russian GOST Standards in English Translation

All GOST standards, national standards, state standards, GOST R, GOST R ISO, GOST ISO, GOST EN, GOST IEC standards of the Russian Federation in English https://gostpe..

Full text of "Proceedings of the annual conventio

Full text of "Proceedings of the annual convention" See other formats

Compilation of Air Pollutant Emission Factors Volum

632 1990 NEPIS online BO 01/21/97 PDF single page tiff emission combustion emissions factors air gas scc fuel process factor percent fired acid control environmental nox sulfur coal waste rating vvEPA United States Environmental Protection Agency Office of Air Quality Planning and

Manual 15: Approvals Fish-Game-Meat Chemical

Our partners will collect data and use cookies for ad personalization and measurement. Learn how we and our ad partner Google, collect and use data.

2018-3-22 · 1 7/8/2014 9/25/2014. 1 9/9/2011 9/5/2014 9/9/2017 12/12/2017 12/11/2020 12/12/2017. 1 10/19/2009 12/8/2012 2/6/2013. 2 11/27/2017 11/27/2020. 1 10/1/2012 10/7/20

2018-3-22 · 1 7/8/2014 9/25/2014. 1 9/9/2011 9/5/2014 9/9/2017 12/12/2017 12/11/2020 12/12/2017. 1 10/19/2009 12/8/2012 2/6/2013. 2 11/27/2017 11/27/2020. 1 10/1/2012 10/7/2015

(PDF) Mill training report (viyellatex).pdf | Md. Rafsa

In Viyellatex fire-tube boiler is used. Steam produces form boiler is supplied by the steam line in different section. Fig: Fire tube boiler Classification of boilers: 1. Fire tube boiler: Low pressure, low running cost

Project Design Criteria Document ENG.20071016.000

Project Design Criteria Document ENG.20071016.000S 000-3DR-MGRO-00100-000-007 October 2007. by user

CONTRA

2019-8-9 · Provision for 110-120 volt, 60 H z, single phase A.C. power. A. Packaging: All equipment shall be suitably packaged to facilitate handling and protect 2. All equipment having moving parts including gears, electric